Hamilton undertook a comprehensive project for Westside Corporation, which utilised our full turn-key capabilities from initial designs and engineering, through to construction and commissioning ready for client handover. Under the astute leadership of our Project Manager, Troy Small, the new Gas Compressor panel was successfully completed in July 2023 and exceeded the clients expectations.

Client: Westside Corporation
Location: Moura, QLD
Completion: July 2023
 
Project Overview:

Beginning with conceptual design and engineering packages, our team meticulously developed project drawings, laying the groundwork for offsite manufacturing and procurement of necessary components, including replacement compressor instrumentation. As part of our commitment to quality assurance, we conducted FAT testing of the compressor control panel, ensuring compliance with stringent standards and hazardous area regulations. Upon completion, our skilled technicians oversaw onsite installation, managing demolition, cabling replacement, and wiring modifications, all while adhering to hazardous area standards. Finally, our involvement extended to commissioning activities and the delivery of comprehensive as-built drawings and MDR handover packages, reflecting Hamilton's dedication to delivering excellence at every stage of the project lifecycle.

Project Statistics

4 Months

Project Duration

$300,000

Project Value

1200

Man Hours

Project Gallery

bottom of page