43 items found for ""
- Swan Analytical - Steam Water Analysis System
< Back Swan Analytical - Steam Water Analysis System Hamilton had the pleasure of facilitating the design, procurement and construction of the Steam Water Analyser Systems for Swan Analytical's delivery to BHP's sites. This was a bespoke project that required innovation, agility and the highest of standards to align with BHP's requirements. Client: Swan Analytical/BHP Location: Gympie, QLD Completion: 2021 Project Overview: Hamilton was commissioned to design, procure and construct three Water Analytical Containers for SWAS Equipment to enhance the steam and water analysis capabilities at BHP power sites. The scope included comprehensive aspects such as electrical and instrumentation design, mechanical design, procurement, and installation of stainless-steel racks, sinks, and benches. Additionally, water pipework for cooling and sample lines was designed and procured, with Swagelok tube and fittings supplied and installed. The project also entailed switchboard design, supply, and build to ensure seamless operations. Our collaborative approach with Swan Analytical, combined with technical expertise, ensures the seamless integration of advanced analytical systems, enhancing operational efficiency and reliability for our clients like BHP. Project Statistics 12 Months Project Duration $400,000 Project Value 2000 Man Hours Project Gallery Previous Next
- Sibelco Control System Upgrade
< Back Sibelco Control System Upgrade Hamilton was engaged to bring back online the obsolete crusher motor at their processing facility in Calliope, through the design and installation of a new control system aimed at enhancing production efficiencies and safety data. Client: Sibelco Location: Calliope, QLD Completion: 2018 Project Overview: Hamilton's scope involved the meticulous design, supply, and construction of a new control system for the obsolete crusher motor. The project necessitated replacing the outdated DC motor with a new AC motor and implementing a new variable speed drive. Additionally, level monitoring equipment was installed to monitor the rock level in the crusher, ensuring optimal crushing efficiency. The project's significant highlight was integrating a new control system into an existing plant without any available site drawings. The Hamilton team traced out every cable and determined its function before commencing the design process. Moreover, a substantial amount of redundant and unsafe cabling was removed from the switchboards, enhancing safety and equipment maintainability. Project Statistics 3 Months Project Duration $80,000 Project Value 452 Man Hours Project Gallery Previous Next
- AGL Type B Upgrade
< Back AGL Type B Upgrade Hamilton successfully completed the Type B Upgrade project for AGL, a significant endeavour aimed at enhancing the efficiency and reliability of gas compressor operations. The scope of works involved the meticulous supply and installation of new Type B control panels and associated equipment for the 4 Gas compressors and 2 Glycol Re-boilers. Client: AGL Location: Surat, QLD Completion: 2018 Project Overview: Hamilton's team executed the construction and installation of new Type B controllers housed within stainless steel enclosures, ensuring durability and resilience in challenging operational environments. Our experts meticulously installed new power and control cabling tailored to the specific requirements of the gas trains, taking into account maintenance and hazardous areas considerations to ensure optimal safety and operational efficiency. In response to unforeseen challenges, Hamilton swiftly addressed last-minute rectifications, which included the replacement of temperature probes, pressure transmitters, and vibration transmitters on several gas compressors. Our team sourced suitable replacements that met stringent hazardous area standards and operational requirements, ensuring uninterrupted functionality and compliance with safety regulations. Project Statistics 6 Months Project Duration $850,000 Project Value 5000 Man Hours Project Gallery Previous Next
- Westside Gas Compressor Control Panel
< Back Westside Gas Compressor Control Panel Hamilton undertook a comprehensive project for Westside Corporation, which utilised our full turn-key capabilities from initial designs and engineering, through to construction and commissioning ready for client handover. Under the astute leadership of our Project Manager, Troy Small, the new Gas Compressor panel was successfully completed in July 2023 and exceeded the clients expectations. Client: Westside Corporation Location: Moura, QLD Completion: July 2023 Project Overview: Beginning with conceptual design and engineering packages, our team meticulously developed project drawings, laying the groundwork for offsite manufacturing and procurement of necessary components, including replacement compressor instrumentation. As part of our commitment to quality assurance, we conducted FAT testing of the compressor control panel, ensuring compliance with stringent standards and hazardous area regulations. Upon completion, our skilled technicians oversaw onsite installation, managing demolition, cabling replacement, and wiring modifications, all while adhering to hazardous area standards. Finally, our involvement extended to commissioning activities and the delivery of comprehensive as-built drawings and MDR handover packages, reflecting Hamilton's dedication to delivering excellence at every stage of the project lifecycle. Project Statistics 4 Months Project Duration $300,000 Project Value 1200 Man Hours Project Gallery Previous Next
- Coca Cola Australia Project Omega
< Back Coca Cola Australia Project Omega Hamilton successfully completed a project for Coca Cola Europacific Partners at their Richlands manufacturing facility. The project involved a comprehensive scope of works over a six-week duration. Under the expert management of David Harding, our dedicated team executed approximately 1100 man-hours to deliver the scope inline with the clients budget and time objectives. Client: Coca Cola Europacific Location: Richlands QLD Completion: 2024 Project Overview: The scope of works included the meticulous decommissioning of several process lines, Aseptic area and the filtration plant, which required hazardous area certification and expertise. Additionally, the relocation of MSB8 and the disconnection and retrieval of field instruments for future use aligned with our companies ethos to sustainable practices. Scheduled for completion in early 2024, this endeavour underscores Hamilton's commitment to quality workmanship, and highlights our unique skill sets in Instrumentation and Hazardous Area construction projects. Project Statistics 6 Weeks Project Duration $200,000 Project Value 1100 Man Hours Project Gallery Previous Next
- GRC Water Asset Surveillance Upgrade
< Back GRC Water Asset Surveillance Upgrade Hamilton was successful in their tender to upgrade the water monitoring equipment across all the water assets through out the Gympie Region. Our instrumentation capabilities perfectly aligned with the technical requirements to procure, install and commission the correct instrumentation to enhance the accuracy and reliability of the regions water monitoring processes. Client: Gympie Regional Council Location: Wide Bay/Burnett Region QLD Completion: 2024 Project Overview: Our scope of works involved the meticulous supply of water monitoring equipment and Water Flow Meters for Gympie Regional Council's water and wastewater assets. This comprehensive solution aimed to enhance the accuracy and reliability of water monitoring processes crucial for maintaining government assets and ensuring efficient water management. Accurate instrumentation and data are paramount for effective water monitoring, especially for government assets managed by Gympie Regional Council. The supplied equipment plays a vital role in monitoring water quality, flow rates, and wastewater treatment processes, enabling the council to make informed decisions and ensure the sustainability of water resources in the region. Project Statistics 12 Months Project Duration $500,000 Project Value 900 Man Hours Project Gallery Previous Next
- Bundaberg Brewed Drinks Facility Upgrade
< Back Bundaberg Brewed Drinks Facility Upgrade Hamilton is proud to share the successful completion of our scope of works for the new Bundaberg Brewed Drinks Facility, a stones throw from their original and iconic master brew house. Project Managed by Nick Hamilton, the facility opened it doors to the public in November 2023 to showcase the outstanding upgrades and capabilities of the new plant. Client: Bundaberg Brewed Drinks Location: Bundaberg QLD Completion: 2023 Project Overview: Our scope of works included the comprehensive supply and installation of all control wiring, IFM Instrumentation, and main switchboard installation and commissioning. Additionally, our team managed the Brewhouse, CIP, and communication network installation and commissioning, along with Hazardous Areas Installations and Inspections. We utilised Stainless Steel Cable supports for enduring durability, executed a complete I/O Link and ASi Buss installation to enhance communication efficiency, and established strict hygienic protocols for product integrity and safety. Our flexible workforce facilitated seamless coordination with other construction disciplines, maximising efficiency. This high value project is a testament to our teams commitment to quality and safety, and strategic partnerships with industry leading suppliers, engineers and specialist contractors. Project Statistics 18 Months Project Duration $2,500,000 Project Value 12000 Man Hours Project Gallery Previous Next