43 results found with an empty search
- Bundaberg Brewed Drinks Facility Upgrade | Hamilton Pty Ltd
< Back Bundaberg Brewed Drinks Facility Upgrade Hamilton is proud to share the successful completion of our scope of works for the new Bundaberg Brewed Drinks Facility, a stones throw from their original and iconic master brew house. Project Managed by Nick Hamilton, the facility opened it doors to the public in November 2023 to showcase the outstanding upgrades and capabilities of the new plant. Client: Bundaberg Brewed Drinks Location: Bundaberg QLD Completion: 2023 Project Overview: Our scope of works included the comprehensive supply and installation of all control wiring, IFM Instrumentation, and main switchboard installation and commissioning. Additionally, our team managed the Brewhouse, CIP, and communication network installation and commissioning, along with Hazardous Areas Installations and Inspections. We utilised Stainless Steel Cable supports for enduring durability, executed a complete I/O Link and ASi Buss installation to enhance communication efficiency, and established strict hygienic protocols for product integrity and safety. Our flexible workforce facilitated seamless coordination with other construction disciplines, maximising efficiency. This high value project is a testament to our teams commitment to quality and safety, and strategic partnerships with industry leading suppliers, engineers and specialist contractors. Project Statistics 18 Months Project Duration $2,500,000 Project Value 12000 Man Hours Project Gallery Previous Next
- Sibelco Control System Upgrade | Hamilton Pty Ltd
< Back Sibelco Control System Upgrade Hamilton was engaged to bring back online the obsolete crusher motor at their processing facility in Calliope, through the design and installation of a new control system aimed at enhancing production efficiencies and safety data. Client: Sibelco Location: Calliope, QLD Completion: 2018 Project Overview: Hamilton's scope involved the meticulous design, supply, and construction of a new control system for the obsolete crusher motor. The project necessitated replacing the outdated DC motor with a new AC motor and implementing a new variable speed drive. Additionally, level monitoring equipment was installed to monitor the rock level in the crusher, ensuring optimal crushing efficiency. The project's significant highlight was integrating a new control system into an existing plant without any available site drawings. The Hamilton team traced out every cable and determined its function before commencing the design process. Moreover, a substantial amount of redundant and unsafe cabling was removed from the switchboards, enhancing safety and equipment maintainability. Project Statistics 3 Months Project Duration $80,000 Project Value 452 Man Hours Project Gallery Previous Next
- Swan Analytical - Steam Water Analysis System | Hamilton Pty Ltd
< Back Swan Analytical - Steam Water Analysis System Hamilton had the pleasure of facilitating the design, procurement and construction of the Steam Water Analyser Systems for Swan Analytical's delivery to BHP's sites. This was a bespoke project that required innovation, agility and the highest of standards to align with BHP's requirements. Client: Swan Analytical/BHP Location: Gympie, QLD Completion: 2021 Project Overview: Hamilton was commissioned to design, procure and construct three Water Analytical Containers for SWAS Equipment to enhance the steam and water analysis capabilities at BHP power sites. The scope included comprehensive aspects such as electrical and instrumentation design, mechanical design, procurement, and installation of stainless-steel racks, sinks, and benches. Additionally, water pipework for cooling and sample lines was designed and procured, with Swagelok tube and fittings supplied and installed. The project also entailed switchboard design, supply, and build to ensure seamless operations. Our collaborative approach with Swan Analytical, combined with technical expertise, ensures the seamless integration of advanced analytical systems, enhancing operational efficiency and reliability for our clients like BHP. Project Statistics 12 Months Project Duration $400,000 Project Value 2000 Man Hours Project Gallery Previous Next
- Electrical Maintenance Solutions for Instrumentation & Engineering | Hamilton | Australia
Hamilton offers comprehensive electrical maintenance solutions. Our proactive approach to maintenance is designed to minimise downtime and maximise efficiency. With detailed inspections, proactive maintenance plans, and expert workmanship, we ensure your electrical systems and processing plants operate at peak performance. Electrical Maintenance Seeking dependable electrical maintenance support for your industrial operations across Brisbane, Gold Coast, Darling Downs, Gympie, Sunshine Coast, Maryborough, and Bundaberg? Look to Hamilton for comprehensive solutions tailored to your needs. Our proactive approach to maintenance is designed to minimise downtime and maximise efficiency. With detailed inspections, proactive maintenance plans, and expert workmanship, we ensure your electrical systems and processing plants operate at peak performance. By identifying and rectifying common issues and errors such as machinery breakdowns, motor failure, damaged wiring, electrical faults, voltage fluctuations and more, we keep our clients facilities online for longer, reducing costly downtime. From the Manufacturing and Food & Beverage sectors to Mining & Minerals, Oil & Gas, Water & Waste, and Infrastructure industries, Hamilton is your trusted partner for reliable electrical maintenance services. Full Electrical Capabilities Our Electrical Maintenance services are available; Brisbane Toowoomba Gold Coast Darling Downs Sunshine Coast Gympie Maryborough Bundaberg Western QLD Central Queensland Gladstone Supporting our vital industries; Oil & Gas Mining & Minerals Manufacturing Food & Beverage Agriculture Water & Waste Treatment Infrastructure Power & Energy Preventative Maintenance Scheduled inspections, testing and servicing of electrical equipment to identify and address potential issues before they lead to failures or downtime. Equipment Testing & Calibration Testing and calibration of electrical equipment and instrumentation to ensure accurate readings, optimal performance and the truth of your production output. It also eliminates inefficiencies in power consumption. Electrical Systems Troubleshooting Identifying and diagnosing electrical faults, malfunctions and performance issues to restore system functionality. Repairs & Replacements Repairing or replacing faulty components, wiring, switches, circuit breakers and other electrical devices to maintain system integrity, safety and operation productivity. Emergency Call Out Prompt response to electrical issues, such as power outages, electrical failures and safety hazards ensuring the safety of your plant, people and continued operations. Energy Audits & Optimisation Assessing energy usage, identifying inefficiencies and implementing strategies to reduces costs, without interfering with production and processes. Lighting Maintenance Maintenance and repair of industrial lighting systems, including bulb replacement, fixture repairs, energy-efficient lighting upgrades and hazardous areas. Power Quality Analysis Monitoring and analysing power quality parameters to identify issues such as voltage fluctuations, harmonic distortions and power factor inefficiencies. Request A Quote. Want more information about our Electrical Maintenance services! Send us a quick enquiry, and we will be in touch shortly. First Name Last Name Email Phone Company Your Message Send Thanks for submitting!
- Westside Gas Compressor Control Panel | Hamilton Pty Ltd
< Back Westside Gas Compressor Control Panel Hamilton undertook a comprehensive project for Westside Corporation, which utilised our full turn-key capabilities from initial designs and engineering, through to construction and commissioning ready for client handover. Under the astute leadership of our Project Manager, Troy Small, the new Gas Compressor panel was successfully completed in July 2023 and exceeded the clients expectations. Client: Westside Corporation Location: Moura, QLD Completion: July 2023 Project Overview: Beginning with conceptual design and engineering packages, our team meticulously developed project drawings, laying the groundwork for offsite manufacturing and procurement of necessary components, including replacement compressor instrumentation. As part of our commitment to quality assurance, we conducted FAT testing of the compressor control panel, ensuring compliance with stringent standards and hazardous area regulations. Upon completion, our skilled technicians oversaw onsite installation, managing demolition, cabling replacement, and wiring modifications, all while adhering to hazardous area standards. Finally, our involvement extended to commissioning activities and the delivery of comprehensive as-built drawings and MDR handover packages, reflecting Hamilton's dedication to delivering excellence at every stage of the project lifecycle. Project Statistics 4 Months Project Duration $300,000 Project Value 1200 Man Hours Project Gallery Previous Next
- AGL Type B Upgrade | Hamilton Pty Ltd
< Back AGL Type B Upgrade Hamilton successfully completed the Type B Upgrade project for AGL, a significant endeavour aimed at enhancing the efficiency and reliability of gas compressor operations. The scope of works involved the meticulous supply and installation of new Type B control panels and associated equipment for the 4 Gas compressors and 2 Glycol Re-boilers. Client: AGL Location: Surat, QLD Completion: 2018 Project Overview: Hamilton's team executed the construction and installation of new Type B controllers housed within stainless steel enclosures, ensuring durability and resilience in challenging operational environments. Our experts meticulously installed new power and control cabling tailored to the specific requirements of the gas trains, taking into account maintenance and hazardous areas considerations to ensure optimal safety and operational efficiency. In response to unforeseen challenges, Hamilton swiftly addressed last-minute rectifications, which included the replacement of temperature probes, pressure transmitters, and vibration transmitters on several gas compressors. Our team sourced suitable replacements that met stringent hazardous area standards and operational requirements, ensuring uninterrupted functionality and compliance with safety regulations. Project Statistics 6 Months Project Duration $850,000 Project Value 5000 Man Hours Project Gallery Previous Next
- Type B Gas Services | Hamilton | Industrial Engineering Services | Valve Servicing | Australia
Hamilton provides specialized Type B services encompassing design, manufacturing of Type B Gas Trains, construction, commissioning projects, control systems, and certification and approvals. Our certified Type B services cover hazardous areas across Australia, ensuring safety and compliance in high-risk environments. Trust Hamilton for expert solutions tailored to Type B requirements. Type B We are the industry leader for Type B services, with advanced training and qualifications in Type B Gas design, installation, upgrades, inspections and auditing. Our technicians are specialists in their field and are available for on-going service support and repairs. Type B Capabilities Type B compliance is the regulation of fuel gas management for appliances that extend beyond the standard requirements for general gas appliances. These specialised appliances are commonly encountered in heavy industrial settings, such as large gas compressors or ovens for industrial heating. Our team possess a wealth of experience and a strong track record of successfully executing complex Type B Projects, Equipment Servicing and Repairs. Our portfolio includes comprehensive designs for Gas Trains and Control Systems, a testament to our technical abilities in this complex and high regulated field. Type B Design Hamilton's Engineering Team excels in design Type B systems that are approved for use, ensuring they are easily maintainable and serviceable. With a commitment to simplicity and compliance, our team utilises their extensive experience to deliver solutions that are logical and effective. Type B Gas Trains Hamilton boasts a large manufacturing facility in Brisbane, ideal for the procurement, construction and Factory Acceptance Testing services for complete Gas Train builds. Our Gas Trains are assembled using AGA-Approved components and are stedfast in compliance with Australian standards. We encourage our clients to participate in factory acceptance tests (FATs), allowing them to inspect the finished product prior to dispatching. Our Gas Trains are constructed from a variety of approved materials, from carbon steel to stainless steel, and can provide customised coatings to meet our clients specified site standards. Control Systems Not only do we design and construct Type B Systems, but our Engineering Team also specialises in customising Type B Control Systems to meet the precise requirements of your site. We offer a range of control system options, including PLC's, Relay Logic or specific manufacturer controllers such as Deep Sea Controllers. Our engineers design bespoke control panels, housed in compliant and customisable enclosures taking into consideration our clients site specifications and conditions, such as Hazardous Areas with tamper-proof requirements ensuring optimal performance and safety. Type B Construction Projects & Commissioning Hamilton's Project and Construction teams are fully equipped to manage every aspect of Type B installations with precision, safety and exceptional workmanship. From the mechanical installation of Fuel Gas Pipework to the Electrical Connection to existing infrastructure, and through to commissioning and start-up, our team oversee the entire process seamlessly. With an extensive selection of tooling, intensive training and years of collective experience, we guarantee a smooth and successful project delivery. Type B Certificates & Approvals. As an integral component of our Type B Services, Hamilton can facilitate the necessary paperwork and submissions to secure all requisite approvals for your Type B Project. We will coordinate onsite inspections, oversee the procurement of nameplates, and develop comprehensive maintenance plans to ensure ongoing compliance with regulations and standards. Want more information about our Type B services? Get in Touch. Send Us A Message
- Commercial Agreement | Engineering and Instrumentation Solutions | Hamilton Pty Ltd
Hamilton's commercial terms of engagement designed to ensure clarity, transparency and fairness in our business transactions. Section Title This is a Paragraph. Click on "Edit Text" or double click on the text box to start editing the content and make sure to add any relevant details or information that you want to share with your visitors. COMMERCIAL AGREEMENT Standard Terms and Conditions These are the Contractor (“we” “our” “us”) standard Terms and Conditions which will apply to every contract when the Customer (“you”) engageus (the Contractor) to perform services. When providing our services, we may also need to supply product/s. The Contractor reserves the right to amend these Terms and Conditions from time to time at their discretion. Any changes made in such revision take immediate effect once the Customer is notified of such a change. Engagement 1. The Contractor represents and warrants that the Contractor has all the necessary skills, knowledge, experience and expertise to perform the services and will perform the service in a proper and competent manner. 2. The Contractor holds all necessary licenses, insurances and permits required in order to allow the Contractor to perform the services. Where there are any applicable industry 3. Standards and codes, they will at all times be complied with by the Contractor. The Contractor will be responsible for the obtaining of necessary Electrical Work approval permits from requisite Government authorities. The Contractor and all the Contractor’s employees and permitted sub-contractors are properly qualified, experienced, licensed (where applicable) and competent to properly perform and will perform the service to the required standards and codes. 4. The Customer is responsible for acquiring necessary consents from Government and / or other authority – including any customer internal authority, with regard but not limited to matters such as environmental approvals, land use, rights of way etc. 5. Where any manuals or drawings are required in order for the Customer to enjoy or use the services or as a legal requirement, the Contractor will provide these to the Customer as hard copy and or electronic form as the Customer may reasonably require and for no additional fee. Where the Customer requires additional copies or replacement copies the Contractor may charge additional fees for the provision of such additional or replacement manuals or drawings. 6. If an event occurs that is beyond the reasonable control of the Contractor which prevents the Contractor from performing the service on or by the date agreed, the Contractor will immediately notify the Customer and give an estimate of the time for completion of the service. The Contractor will make all reasonable efforts to minimize any inconvenience to the Customer. 7. The Contractor will provide all equipment and all materials as may be necessary to properly and efficiently perform the service. Unless otherwise agreed in writing all materials including products supplied will be new and of high quality fit for their purpose. All Contractor equipment will be safe for use, be properly maintained and capable of being used to carry out the service. 8. If the Customer requires a variation to the service, the Contractor will provide a quotation for performing the service as varied for which an additional sum will be added to the price if accepted by the Customer. If the Customer does not accept the quotation, the Contractor is not obliged to carry out the variation. Customer acceptance of the variation will be by means of either issuing a purchase order referencing the variation quotation or by signing and stating the Customer’s agreement to the quotation and returning it to the Contractor. The Contractor will not undertake any requested variation until and after written agreement as detailed above is provided. 9. The Contractor may use sub-contractors to provide some of the service. In such circumstances, the Contractor will ensure that: a) the sub-contractors so engaged are suitably qualified, hold all necessary licenses and are otherwise able to perform the service in a proper and workman-like manner; b) the sub-contractors so engaged, do not by act or omission do or not do anything that would, if done or not done by the Contractor be a breach any of these terms; c) the sub-contractors so engaged have current or necessary insurances. 10. The Contractor is solely responsible for all fees payable to sub-contractors. Acceptance Of These Terms 11. Any act by the Customer or those legally acting on behalf of the customer which requests the Contractor to begin performing any services or providing any materials will be deemed as acceptance of these Terms and Conditions. 12. Once these Terms and Conditions are accepted they are irrevocable and cannot be amended without the written consent of the Contractor. 13. In the event there is more than one party as a Customer to these Terms and Conditions, all Customers will be jointly liable for these Terms and Conditions. 14. Should the Customer cancel the engagement of the Contractor after it has been accepted, the Customer agrees they may be held liable for any reasonable costs incurred by the Contractor in relation to the provision of the services and/or provision of products up to the point of cancellation including but not limited to restocking fees, non recoverable freight charges, cost of permits and approvals, design and drafting expenses and labour. Quotes, Invoices and Payment 15. A quote provided by the Contractor will remain valid for thirty days unless otherwise expressly stated. On expiry of that period, if the Customer wishes to proceed a quote revision will need to be provided prior to the Contractor undertaking the service. 16. The Customer will pay the Contractor’s fee in accordance with the Terms of the Contractor’s quotation, Customer Trade Account or as defined in quotation. The price excludes GST. 17. The Contractor will issue a tax invoice for the service setting out the service performed, including any variation, the date the service was performed and by whom. The tax invoice will also separately identify all expenses and any GST payable. This tax invoice will include the final price for the services performed and any goods provided, this price may vary from the quoted price if authorized variations have been agreed to during the execution of the services. 18. Payment of the Contractor’s tax invoice must be made in any of the following manner: Credit card, cheque, electronic transfer to the Contractor's bank account or Cash. Payment by Cheque will only be accepted where the Customer has a Trade Account with the Contractor or the Customer provides photographic Identification that states name, date of birth and residential address of the Customer. 19. Where the Customer fails to pay any tax invoice on or before the due date, the Customer agrees that the Contractor will add interest to the total outstanding amount at the rate of 1/12 of the Commonwealth Bank Overdraft interest rate per calendar month and that the Customer will be liable to pay an accrued interest in addition to the outstanding amount. 20. In the event the Customer defaults in payment of an invoice, the customer shall indemnify the Contractor from any costs incurred by the Contractor in recovering the outstanding amount, including but not limited to solicitors fees. We retain title to any Equipment and services (even if You go into liquidation or become bankrupt) until we receive payment in full. 21. The Customer is not entitled to deduct any invoiced amount from any amounts owing to the Customer by the Contractor. 22. You are not entitled to offer, sell, assign, sub-let, charge, mortgage, pledge or create any form of security interest over, or otherwise deal with any Equipment or service supplied in any way until title has passed to you on full payment being received by us for any equipment, material and / or services provided. In no circumstances prior to full payment being received by us will the any equipment, materials and/or services supplied by the us be deemed to be a fixture. You consent to Us affecting and maintaining a registration on the register (in any manner we consider appropriate) in relation to any security interest contemplated or constituted by this Contractor Agreement in the Equipment a nd/or services and the proceeds arising in respect of any dealing in the Equipment and / or services and You agree to sign any documents and provide all assistance and information to Us required to facilitate the registration and maintenance of any security interest. We may at any time register a financing statement or financing change statement in respect of a security interest (including any purchase money security interest). You waive the right to receive notice of a verification statement in relation to any regis tration on the register of a security interest in respect of any Equipment, materials and/or services supplied by us. a) You undertake to: do anything (in each case, including executing any new document or providing any information) that is required by Us (i) so that We acquire and maintain one or more perfected security interests under the PPSA in respect of the Equipment and its proceeds, (ii) to register a financing statement or financing change statement and (iii) to ensure that Our security position, and rights and obligations, are not adversely affected by the PPSA; (iv) not register a financing change statement in respect of a security interest contemplated or constituted by this Hire Agreement without Our prior written consent; and (v)not register, or permit to be registered, a financing statement or a financing change statement in relation to any Equipment, Material and or/services supplied by us in favor of a third party without Our prior written consent. b) If Chapter 4 of the PPS Act would otherwise apply to the enforcement of a security interest arising under or in connection with this Contractor Agreement and: (i)section 115(1) of the PPS Act allows for the contracting out of provisions of the PPS Act, the following provisions of the PPS Act will not apply and You will have no rights under them: section 95 (to the extent that it requires the secured party to give notices to the grantor); section 96; section 118 (to the extent that it allows a secured party to give notices to the grantor); section 121(4); section 125; section 130; section 132(3)(d); section 132(4); section 135; section 142 and section 143; and (b) section 115(7) of the PPS Act allows for the contracting out of provisions of the PPS Act, the following provisions of the PPS Act will not apply and You will have no rights under them: section 127; section 129(2) and (3); section 130(1); section 132; section 134(2); section 135; section 136(3), (4) and (5) and section 137. c) Unless otherwise agreed and to the extent permitted by the PPSA, You and We agree not to disclose information of the kind referred to in section 275(1) of the PPS Act to an interested person, or any other person requested by an interested person. You waive any right You may have, or but for this clause may have had, under section 275(7)(c) of the PPS Act to authorize the disclosure of the above information. For the purposes of section 20(2) of the PPS Act, the collateral is Equipment, Material and/or services supplied by us under this contractor agreement. This Agreement is a security agreement for the purposes of the PPS Act. d) We may apply amounts received in connection with this Agreement to satisfy obligations secured by a security interest contemplated or constituted by this Agreement in any way We determine in Our absolute discretion. e) You agree to notify Us in writing of any change to Your details set out in the Credit Application, within 5 days from the date of such change. Workplace Health and Safety 23. The Customer will ensure that, if the service is to be performed on the Customer’s property, the Customer is authorized to occupy those premises and obtain the service. 24. The Customer will ensure that if the service is to be performed on the Customer’s property, that at all times the property is safe and that all facilities provided by the Customer for the purposes of enabling the service to be performed are also safe. The Customer is responsible for ensuring that the Contractor has access to a reasonable quantity of potable water for drinking and hygiene purposes. 25. The Customer will ensure that the Contractor has free and unimpeded access to the place in which the services are to take place and that the Customer will do all things to ensure that the Contractor is not delayed by matters within the control of the Customer. The Customer accepts that the Contractor has the right to impose stand down charges and recover additional costs incurred where work is delayed by reason not in the control of the Contractor and where the Contractor is unable to reasonably reschedule services 26. The Contractor will ensure that at all times in performing the service it uses safe and proper procedures and practices and that all its employees are properly trained and supervised and observe all proper safety practices. Where protective equipment, materials or clothing are required these will be provided by the Contractor and the Contractor will ensure that these are used at all relevant times. 27. The Contractor will at all times have current Workers Compensation insurance and will, on request with prior notice, provide evidence to the Customer of its currency. Limitation on Warranty 28. The Contractor warrants that all the service it performs including any product it supplies as part of the service will be fit for its intended purpose, will be capable of being used by the Customer for its intended purpose and will perform in accordance within its applicable specifications (if any). 29. All statutory warranties that can be lawfully excluded are hereby expressly excluded. 30. To the extent permitted by law, the Contractor is not liable for negligence or otherwise to any person including the Customer for any loss or damage including consequential loss suffered or incurred in relation to the Contractor’s service or products supplied. 31. Where the service is not of the kind ordinarily required for personal, domestic or household use or consumption then the liability of the Contractor is limited pursuant to s.64A of the Competition and Consumer Act 2010 (Cth) to, at the discretion of the Contractor: a) the supplying of the service again; or b) the payment of the cost/s of having the service supplied again. Jurisdiction 32. It is agreed by the Parties that these Terms and Conditions will be construed in accordance with the Law of Queensland and each Party covenants that it submits to the jurisdiction of the Courts of Queensland for the resolution of any dispute under the Agreement. Force Majeure 33. Neither the Contractor nor the Customer shall be held liable for any breach of these terms where the breach arises from an act of God, war, natural disaster, terrorism or any other event beyond the reasonable control of either party.
- Projects
Browse Hamilton's project portfolio, a collection of electrical, instrumentation, hazardous area, and Type B projects on our Project Page. With a commitment to innovation, quality, and sustainability, we deliver tailored solutions that optimize performance and enhance operational efficiency across various industries. Project Portfolio As leaders in the industry for specialised Electrical and Instrumentation turn-key EPC Projects, Hamilton is proud to showcase a selection of completed works that speaks of our commitment to quality, innovation and efficiency. With a dedicated in house engineering department, we design, procure, construct and commission our clients vision. With additional qualifications and expertise in the highly technical field of Hazardous Areas and Type B Gas, we are the singular provider for complex projects. With an agile team, we are able to scale quickly to provide support for projects from $50,000 up to $3million and beyond. Our commitment to sustainability ensures our clients benefit from waste reduction, efficient design and equipment choices that reduce energy consumption and smart design that maximises output and profitability. With a reputation of delivering projects on-time and within budget, Hamilton stands as your dedicated partner in achieving your project goals. If you have a project you would like to discuss, get in touch with our Projects Team. Contact Us AGL Dust Filter Upgrade Hazardous Area Dust Filter Unit Installation Read More AGL Type B Upgrade Hamilton successfully completed the Type B Upgrade project for AGL, a significant endeavour aimed at enhancing the efficiency and reliability of gas compressor operations. The scope of works involved the meticulous supply and installation of new Type B control panels and associated equipment for the 4 Gas compressors and 2 Glycol Re-boilers. Read More Bundaberg Brewed Drinks Facility Upgrade Hamilton is proud to share the successful completion of our scope of works for the new Bundaberg Brewed Drinks Facility, a stones throw from their original and iconic master brew house. Project Managed by Nick Hamilton, the facility opened it doors to the public in November 2023 to showcase the outstanding upgrades and capabilities of the new plant. Read More Coca Cola Australia Project Omega Hamilton successfully completed a project for Coca Cola Europacific Partners at their Richlands manufacturing facility. The project involved a comprehensive scope of works over a six-week duration. Under the expert management of David Harding, our dedicated team executed approximately 1100 man-hours to deliver the scope inline with the clients budget and time objectives. Read More GRC Water Asset Surveillance Upgrade Hamilton was successful in their tender to upgrade the water monitoring equipment across all the water assets through out the Gympie Region. Our instrumentation capabilities perfectly aligned with the technical requirements to procure, install and commission the correct instrumentation to enhance the accuracy and reliability of the regions water monitoring processes. Read More Gympie Regional Council - Water Treatment Plant Upgrade Water Treatment Plant - Filtration Control Upgrade Read More Hazardous Area Skid Inspections – Western Australian Gas Client Hazardous Area Skid Inspections – Western Australian Gas Client Read More Sibelco Control System Upgrade Hamilton was engaged to bring back online the obsolete crusher motor at their processing facility in Calliope, through the design and installation of a new control system aimed at enhancing production efficiencies and safety data. Read More Swan Analytical - Steam Water Analysis System Hamilton had the pleasure of facilitating the design, procurement and construction of the Steam Water Analyser Systems for Swan Analytical's delivery to BHP's sites. This was a bespoke project that required innovation, agility and the highest of standards to align with BHP's requirements. Read More Westside Gas Compressor Control Panel Hamilton undertook a comprehensive project for Westside Corporation, which utilised our full turn-key capabilities from initial designs and engineering, through to construction and commissioning ready for client handover. Under the astute leadership of our Project Manager, Troy Small, the new Gas Compressor panel was successfully completed in July 2023 and exceeded the clients expectations. Read More
- Power Generation | Hamilton Pty Ltd
Services Foundations Workshop $55.00 30 minutes Read More Facial $34.90 2 hours Read More Cosmetic Laser $20.50 15 minutes Read More Skin Product Consultation $60.00 15 minutes Read More Manicure $48.00 45 minutes Read More Professional Makeup Consultation $50.00 15 minutes Read More
- Services
Services Foundations Workshop $55.00 30 minutes Read More Facial $34.90 2 hours Read More Cosmetic Laser $20.50 15 minutes Read More Skin Product Consultation $60.00 15 minutes Read More Manicure $48.00 45 minutes Read More Professional Makeup Consultation $50.00 15 minutes Read More
- Projects
Project Portfolio As leaders in the industry for specialised Electrical and Instrumentation turn-key EPC Projects, Hamilton is proud to showcase a selection of completed works that speaks of our commitment to quality, innovation and efficiency. With a dedicated in house engineering department, we design, procure, construct and commission our clients vision. With additional qualifications and expertise in the highly technical field of Hazardous Areas and Type B Gas, we are the singular provider for complex projects. With an agile team, we are able to scale quickly to provide support for projects from $50,000 up to $3million and beyond. Our commitment to sustainability ensures our clients benefit from waste reduction, efficient design and equipment choices that reduce energy consumption and smart design that maximises output and profitability. With a reputation of delivering projects on-time and within budget, Hamilton stands as your dedicated partner in achieving your project goals. If you have a project you would like to discuss, get in touch with our Projects Team. Contact Us AGL Type B Upgrade Hamilton successfully completed the Type B Upgrade project for AGL, a significant endeavour aimed at enhancing the efficiency and reliability of gas compressor operations. The scope of works involved the meticulous supply and installation of new Type B control panels and associated equipment for the 4 Gas compressors and 2 Glycol Re-boilers. Read More Bundaberg Brewed Drinks Facility Upgrade Hamilton is proud to share the successful completion of our scope of works for the new Bundaberg Brewed Drinks Facility, a stones throw from their original and iconic master brew house. Project Managed by Nick Hamilton, the facility opened it doors to the public in November 2023 to showcase the outstanding upgrades and capabilities of the new plant. Read More Coca Cola Australia Project Omega Hamilton successfully completed a project for Coca Cola Europacific Partners at their Richlands manufacturing facility. The project involved a comprehensive scope of works over a six-week duration. Under the expert management of David Harding, our dedicated team executed approximately 1100 man-hours to deliver the scope inline with the clients budget and time objectives. Read More GRC Water Asset Surveillance Upgrade Hamilton was successful in their tender to upgrade the water monitoring equipment across all the water assets through out the Gympie Region. Our instrumentation capabilities perfectly aligned with the technical requirements to procure, install and commission the correct instrumentation to enhance the accuracy and reliability of the regions water monitoring processes. Read More Sibelco Control System Upgrade Hamilton was engaged to bring back online the obsolete crusher motor at their processing facility in Calliope, through the design and installation of a new control system aimed at enhancing production efficiencies and safety data. Read More Swan Analytical - Steam Water Analysis System Hamilton had the pleasure of facilitating the design, procurement and construction of the Steam Water Analyser Systems for Swan Analytical's delivery to BHP's sites. This was a bespoke project that required innovation, agility and the highest of standards to align with BHP's requirements. Read More Westside Gas Compressor Control Panel Hamilton undertook a comprehensive project for Westside Corporation, which utilised our full turn-key capabilities from initial designs and engineering, through to construction and commissioning ready for client handover. Under the astute leadership of our Project Manager, Troy Small, the new Gas Compressor panel was successfully completed in July 2023 and exceeded the clients expectations. Read More